Positioned at the heart of the energy transformation, Metaltech AB has successfully completed the 4.1 MWp Solar Power Plant project in the town of Gătaia, Timiș region, Romania, adding a significant investment to its portfolio. Built on environmental responsibility, advanced technological infrastructure, and a strong sustainability focus, this next-generation energy investment not only supports regional development but also delivers a powerful contribution to clean energy production.
🔍 Project Details
Location: Timiș / Gătaia, Romania
Status: Completed Project
Installed Capacity: 4.1 MWp
Number of Solar Panels: 6,307 high-efficiency panels
The plant has been constructed on a spacious site with high solar exposure and favorable topographical conditions. The system architecture was optimized according to local climate conditions to ensure maximum performance and long-term efficiency.